(+91) 8149260264
info@civilglobe.co.in
Home
About
Services
Sectors
Projects
Career
Contact
High-level Cable stayed Bridge across Narmada River
Project Name:
High-level Cable stayed Bridge across Narmada River
Location:
Jabalpur, Madhya Pradesh
Sector:
Roadways, Bridges and Flyovers
Services:
Detailed Design
Project Highlights
Cast-in-place box girder
Pylon monolithic with superstructure
Cantilever Construction
Project Specifications
Bridge Length: 492 mtrs
Total structure width: 17 mtrs
Cable stayed length: 300 mtrs (75 mtr + 150 mtr + 75 mtr) over the main gorge
Cantilever Construction with Box Type Girder for Superstructure
2 lane carriage way of clear width 7.5 mtr
Walkway footpath of 1.5 mtrs width on both sides
2 planes of cable stays anchored into cantilever portion on each side
Home
About
Services
Sectors
Projects
Career
Contact