(+91) 8149260264
info@civilglobe.co.in
Home
About
Services
Sectors
Projects
Career
Contact
Cable Stayed Bridge at Vishnupuri, Nanded
Project Name:
: DPR Preparation & Detailed Design for the cable stayed Bridge on NH 361A to Khupsarwadi Vishnupuri - Asarjan NH 361A - Balirampur - NH 361- Tuppa - Wadgaon - Bramhanwada Pathrad Railway Station -Degaon (Bk) - Yelegaon Amarabad - Loni (Kh) - Rodgi- Nimgaon to NH 361 Road SH - 412 in ch 0/0 to 7/00 and ch.14 / 00 to 24/00 Near Kaleshwar Temple, Nanded, Maharashtra
Location:
Vishnupuri,Nanded, Maharashtra
Services:
DPR and Detailed Design
Client:
PWD Nanded, Maharashtra
Contractor:
T&T Infra Ltd
Project Cost:
152.67 Cr
Project Specifications
Project Length: 1.6km
Bridge Length: 694 mtrs (3x28+18x25+1x160)
Total structure width: 17 mtrs
Cable stayed length: 160 mtrs (1x160 mtr) above gorge
Cantilever Construction with RCC Beams for Superstructure
LANE CARRIAGE WAY OF CLEAR WIDTH 7.5 MTR
Walkway footpath of 1.5 mtrs width on both sides
Project Highlights
Cantilever Construction
Home
About
Services
Sectors
Projects
Career
Contact